Mining Engineering Archives | Ðǿմ«Ã½ /category/mining-engineering/ Utah Industrial Construction Company & Heavy Civil Contractors Mon, 12 Dec 2022 18:04:40 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 /wp-content/uploads/2018/03/cropped-favicon-512x512-32x32.png Mining Engineering Archives | Ðǿմ«Ã½ /category/mining-engineering/ 32 32 ENR Best Project & Excellence in Ðǿմ«Ã½ 2020 Awards /enr-best-project-excellence-in-safety-2020-awards/ Fri, 23 Oct 2020 14:45:31 +0000 /?p=2400 The following article ENR Best Project & Excellence in Ðǿմ«Ã½ 2020 Awards first appeared on Ðǿմ«Ã½ - Utah Industrial Construction Company & Heavy Civil Contractors

Ðǿմ«Ã½ won 2 prestigious awards from Engineering News-Record for Best Construction Project and Excellence in Ðǿմ«Ã½ for the Mountain States. View the award by clicking the link below: https://www.enr.com/articles/50308-energyindustrial-best-project-excellence-in-safety-best-project-us-magnesium-lithium-plant...

The post ENR Best Project & Excellence in Ðǿմ«Ã½ 2020 Awards appeared first on Ðǿմ«Ã½.

]]>
The following article ENR Best Project & Excellence in Ðǿմ«Ã½ 2020 Awards first appeared on Ðǿմ«Ã½ - Utah Industrial Construction Company & Heavy Civil Contractors

Ðǿմ«Ã½ won 2 prestigious awards from Engineering News-Record for Best Construction Project and Excellence in Ðǿմ«Ã½ for the Mountain States. View the award by clicking the link below:

US Magnesium Lithium Plant
Rowley, Utah
Best Projects

°¿·É²Ô±ð°ù:ÌýUS Magnesium
Lead Design Firm: Job Industrial Services Inc.
General Contractor: Ðǿմ«Ã½ Co.
Subcontractors: Aluma Steel; GEM Buildings; Jones Excavating; Harris Rebar; JD Steel; Petrochem; Staker Parson Cos.; Wasatch Electric

Utah’s first lithium plant will process 10,000 tons of high-grade lithium per year from stockpiled magnesium by-products. The $60-million, state-of-the-art facility will produce 99.9% pure lithium carbonate for batteries in electric vehicles, cell phones, laptops, and other electronics.

The process of extracting lithium from raw materials includes several stages of chemical extraction, product cleaning, and phase changes that have been organized into distinct areas within the new plant.

The plant’s design provides operators and maintenance personnel with carefully located access platforms, ladders, and stairs; suitable equipment spacing; and organized corridors for pipe and electrical tray and cable. Extensive use of structural steel allows operators to easily travel inside and outside buildings and above and around equipment.

The construction team proposed a plan to expedite the procurement process and allow construction to begin at 40% design. With the fast-track schedule, earthwork, concrete installation, steel erection, piping, and equipment setting all took place at the same time.

Ðǿմ«Ã½ ensures that every new employee is mentored and monitored for a minimum of one month by another employee, a process that expedites integrating new personnel into the contractor’s safety culture. The project peaked with more than 150 craft personnel and more than 100,000 self-performed work hours with no recordable incidents or injuries.

Ðǿմ«Ã½ ensures that every new employee is mentored and monitored for a minimum of one month by another employee, a process that expedites integrating new personnel into the contractor’s safety culture. The project peaked with more than 150 craft personnel and more than 100,000 self-performed work hours with no recordable incidents or injuries.

The post ENR Best Project & Excellence in Ðǿմ«Ã½ 2020 Awards appeared first on Ðǿմ«Ã½.

]]>
Ðǿմ«Ã½’s Reclamation Project Made the News! /wollam-constructions-reclamation-project-made-the-local-news/ Wed, 24 Oct 2018 14:27:49 +0000 /?p=2009 The following article Ðǿմ«Ã½’s Reclamation Project Made the News! first appeared on Ðǿմ«Ã½ - Utah Industrial Construction Company & Heavy Civil Contractors

Check out some of the great reclamation work our people are doing for Rio Tinto’s Barney’s Canyon. https://www.ksl.com/article/46412791/rio-tinto-completing-the-mining-circle-of-life Nearly 30 years ago, the first gold was mined in Barney’s Canyon...

The post Ðǿմ«Ã½’s Reclamation Project Made the News! appeared first on Ðǿմ«Ã½.

]]>
The following article Ðǿմ«Ã½’s Reclamation Project Made the News! first appeared on Ðǿմ«Ã½ - Utah Industrial Construction Company & Heavy Civil Contractors

Check out some of the great reclamation work our people are doing for Rio Tinto’s Barney’s Canyon.

Nearly 30 years ago, the first gold was mined in Barney’s Canyon near the site of the world’s largest open pit mining operation.

Since then, the mine has completed its life cycle, and Rio Tinto Kennecott is restoring the site to resemble the state nature originally intended — at a cost of over $50 million.

Located on the east slope of the Oquirrh Mountains, 5 miles north of the Bingham Canyon Mine, the Barney’s Canyon Mine operated from 1989 to 2013 and produced more than 2 million ounces of gold, according to Steve Schnoor, reclamation manager for Rio Tinto Kennecott. Toward the end of the life cycle, the company began transitioning to the reclamation process, he said, in preparation for the eventual discontinuation of active mining.

“In our life cycle of planning, we’re planning throughout the mine’s (operation) and performing concurrent reclamation where we reclaim areas that are no longer in use while we operate others,” he said. “The reclamation process takes an active mine site and then returns it to (its natural form), which in this case is open space and a landscape that is compatible with the adjacent areas.”

The Barney’s Canyon operation consisted of rotary drills, front-end loaders and 85-ton haul trucks, crushing and conveying equipment, milling, heap leaching, gold recovery and refining plants, Schnoor explained.

Construction Trucks On Site

Reclamation is underway on the five heap leach pads — enormous mounds of earth — that involves soil remediation, extending liners and relaxing the slope of the heap leach pads, he said. Additional reclamation efforts include installing additional stormwater controls, removing existing buildings and revegetating the area, he added.

“The reclamation that was performed around the mine and adjacent areas covered 850 acres,” Schnoor said. “We’ve also embarked on the final stages of reclamation over 350 acres.”

The final cost for reclamation efforts in Barney’s Canyon will be more than $50 million and it is expected to be completed in early 2020, he said.

“Ultimately, it will be an open space that will blend in and be wildlife habitat,” he added.

During a media tour on Tuesday, Rio Tinto Kennecott officials touted their efforts to restore the site to a more natural condition that is protective of public health, safety and the environment.

“This is part of what happens with responsible mining companies when you’re no longer actively using areas and you don’t need them anymore, you then reclaim them and make it look more natural and put it back closer to the original state while you’re still mining in other locations,” company spokesman Kyle Bennett said. “In five or 10 years, you’re going to see something that looks much more natural than it does today and it’s going to blend into the hillside.”

He said this process is part of an environmental stewardship approach the company has adopted to preserve the land on which it mines.

“We really need these minerals for modern life,” Bennett said. “So for us to go in and take the minerals and process them, it’s also our responsibility to come back as well and invest in these reclamation activities.”

Tarp Laid Over Prepped Site

To date, more than 800 trees and shrubs have been planted that are native to the area and will be visible throughout the Salt Lake Valley, including Rocky Mountain maple, Gambel oak, Saskatoon serviceberry, Woods rose, mountain mahogany and bitterbrush, he said.

“We are proud of the work we are doing at Barney’s Canyon Mine because it demonstrates how we can successfully close and reclaim a mine that was once a fully operational and productive business,” Marc Cameron, Rio Tinto Kennecott’s managing director, said. “This should provide confidence to our stakeholders across the world that we are demonstrating responsible mining practices.â€

The post Ðǿմ«Ã½’s Reclamation Project Made the News! appeared first on Ðǿմ«Ã½.

]]>